Cleardale 2008

 

  • Client: Alberta Infrastructure and Transportation

  • Consulting Firm: Thurber Engineering Ltd.

  • Cost of Project: $5 million

  • Date: February – September 5, 2008

  • Location: Cleardale, Alberta

  • Scope of Work: Klassen was awarded the Cleardale site in order to excavate 430,000cu.m of fill, stabilize 11 highway slides and provide drainage for existing slumps in order to stabilize 3 km of highway.  The work required a complete Traffic Accommodation Plan, Storm Water Management Plan and ECO Plan.

DSC01773

Moving Fill Across Highway

 

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

Before: Erosion on South side of Highway due to Outlet Failure

IMG_0454

Redesigned Outlet Structure on Nouthside including Culvert Extension and Riprap

IMG_0298

Boring New Culvert Under the Highway

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

Before: Outlet Structure on Northside of Highway

IMG_0462

Outlet Structure on Southside of Highway, Improved Drainage and Concrete Headwall

DSC01773

Project In Motion: April

all sorts 158

Project in Motion: March

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: