Tweddle Place 2008

 

Storm Water Pond

  • Client: City of Edmonton
  • Consulting Firm: ISL Engineering Ltd.
  • Cost of Project: $1.1 million
  • Date: April 17 – July 1, 2008
  • Location: Edmonton, Alberta
  • Scope of Work: Tweddle Place is a residential community on the East side of Edmonton that required a Storm Water Management Pond.  27,000cu.m of fill was removed from site next to Whitemud Drive.  Construction included the designing and implementation of Traffic Accomodation plan to coordinate fill removal and congested city streets.  Drainage for the pond was tied into City sewer system with outlet structures and various underground facilities, which required ECO plan and erosion control measures.  Soil stability measures were implemented for two months.

IMG_0276

Before

IMG_0370

Loading Trucks in Rush Hour

AAc 059

First Cut

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

Completed Site

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: