-
Client: MD Greenview No.1
-
Consulting Firm: EXH Engineering Ltd.
-
Cost of Project: $563,000
-
Timeline: September – November 2008
-
Project Details: Removal of existing bridge structure over the tributary of the Smoky River. Designed a Traffic Accommodation plan and ECO plan. Replaced existing bridge with new culvert and backfill. Added rip rap and erosion control measures.

Leave a Reply