Multi Plate, Debolt AB-2008

-
Client: MD Greenview No.16
-
Consulting Firm: EXH Engineering Ltd.
-
Cost of Project: $563,000
-
Location: DeBolt, Alberta
-
Date: September – November 2008
-
Scope of Work: Removal of existing bridge structure over tributary of Smoky River. Design a Traffic Accommodation plan and ECO plan. Replace existing bridge with new culvert and back fill. Add rip rap and erosion control measures.
Moving Fill
Erosion Control Measures