Project Date : August-September 2018
Project Details: The project was located in thick brush and after logging the area was extremely wet. Conditions were challenging on this project and coupled with the late time of year Lime was used to assist in drying material to meet specifications and complete the project before winter. The total volume of material moved during construction was 177,000m3 to achieve a 300,000m3 water reservoir