35,000 cubic meters of material was excavated on this 250m by 200m wellsite extension. The design for this build was supplied to Klassen Brothers and implemented using GPS equipment.
November to December
35,000 cubic meters of material was excavated on this 250m by 200m wellsite extension. The design for this build was supplied to Klassen Brothers and implemented using GPS equipment.
November to December