Woody Creek 2007

- Client: City of Grande Prairie
- Consulting Firm: Bearisto, Lehners, Ketchum Eng. Ltd.
- Cost of Project: $2.2 million
- Location: Grande Prairie, Alberta
- Date: May 2007-October 2007
-
Scope of Work: Built a 2600m canal drainage system along East side of Grande Prairie, which included: 370,000cu.m of excavation. 140,000sq.m of landscaping, 81.5m of horizontal directional boring. 3 control structures and 5 outfalls.
Before
OLYMPUS DIGITAL CAMERA
Completed Storm Water Management Canal