Peace River Bridge Embutment May 2018

Client: Flat Iron-Aecon

Cost of Project: $400,000.00

Location: Peace River Alberta

Date: May 1- June 1 2018

Scope of Work: We subcontracted to Flat Iron-Aecon to build the Embutment on the West side of the new bridge that was being installed. Roughly 80,000m3 of material was moved to complete this project but it was a great opportunity to be a part of something much larger in the civil industry.