Posted on 

 by 

 in 

Bridge Embedment, Peace River AB, 2018

Cost of Project: $400,000.00

Project Details: We subcontracted to Flat Iron-Aecon to build the Embedment on the West side of the new bridge that was being installed. Roughly 80,000m3 of material was moved to complete this project but it was a great opportunity to be a part of something much larger in the civil industry.

Timeline: May to June

Leave a Reply

Powered by WordPress.com.

%d bloggers like this: