High Grade Road, Northern BC, 2019

Project Details: This road was 21 km long and required over 600,000m3 of material was to be moved. This project was challenging given the time of year and that most the material came from a single borrow pit and required some very long hauls.

 

 

 

 

 

 

 

Timeline: January to August